Major Milestone Achieved

Today marks a significant milestone for ATB – Anderson Tactical Bike Gear. Our patent application has been officially filed with the German Patent and Trademark Office (DPMA). This is the culmination of intensive engineering work, prototype iterations, and rigorous testing.

From Confidentiality to Transparency

During the patent specification preparation phase, we were unable to disclose any technical details or show product images. This confidentiality was necessary to protect the innovation during the critical filing process.

Now that the patent application is submitted and on record, we can transition from confidentiality to transparency. Over the coming weeks, we will begin revealing:

  • Product images and detailed photography
  • Technical specifications and engineering details
  • Use cases and application scenarios
  • Material composition and manufacturing process
  • Mounting system modularity and compatibility

What Makes This Different

The ATB mounting system represents a fundamental departure from conventional bicycle accessory mounting hardware. Engineered to military specifications, it addresses the core shortcomings of existing solutions through:

  • Extreme durability: Built to withstand tactical operations and harsh environmental conditions
  • True modularity: Reconfigurable mounting architecture for mission-specific setups
  • Precision engineering: Manufactured to aerospace-grade tolerances
  • Load distribution: Advanced stress distribution prevents failure points

Development Timeline

The journey from concept to patent filing involved multiple phases:

  • Q4 2025: Initial concept development and market research
  • Q1 2026: Engineering design and CAD modeling
  • Q2 2026: Prototype fabrication and field testing
  • Q3 2026: Patent specification preparation
  • August 13, 2026: Patent application filed with DPMA

What's Next

With the patent application now on file, our focus shifts to production preparation and market readiness. The next phase includes:

  • Finalizing manufacturing partnerships
  • Quality assurance protocol implementation
  • Product photography and documentation
  • Pre-order system setup
  • Distribution channel establishment

Product Reveal Schedule

We will be releasing detailed information in phases over the next few weeks:

  • Week 1: First product images and overview
  • Week 2: Technical specifications and engineering details
  • Week 3: Use case demonstrations and application examples
  • Week 4: Pricing, availability, and pre-order information

Stay Updated

This is just the beginning. Subscribe to our newsletter to receive updates as soon as new information is released. We've spent months building this in the background – now it's time to show what we've created.

Thank you for your patience during the confidential development phase. The wait is almost over.

– Jörge Kellermann
Founder, ATB – Anderson Tactical Bike Gear